Politics · India

Kaleshwaram barrages operation awaits safety clearance and repairs

The operation of the Kaleshwaram Lift Irrigation Scheme (KLIS) barrages will only commence after receiving clearance from the National Dam Safety Authority (NDSA) and the Central Water Commission (CWC). This decision follows the need for repairs and ensuring the safety of the structures. The clearance is a prerequisite for the barrages to be put into operation.

How outlets across the spectrum covered it

Left 0 · Centre 4 · Right 0   n = 4

More balanced coverage on Paksh →